wellbuild lifted mechanical units for a project at Macquarie University. the helicopter based at Parramatta was able to lift the 4 Mechanical pieces of equipment onto the roof top right into position. a rigging crew and mechanical contractor assisted the process. all organised through CASA. It was windy on the day which made the lift more challenging. a large lift area was established with noone allowed under the lift path.